Open transition transfer
The Filax is an open transition (break before make) transfer switch.
The maximum load transfer time is 16ms.
The load is normally supplied by the priority source, and is transferred to the alternate source if:
Reverse transfer from the alternate source to the priority source is initiated when the priority source has operated within the voltage and frequency reverse switching limits during 30s.
Delivery date: 20 days
The Filax has been designed to switch sensitive loads, such as computers or modern entertainment equipment from one AC source to another. The priority source typically is the mains, a generator or shore power. The alternate source typically is an inverter. With its switching time of less than 20 milliseconds, sensitive loads will continue to operate without disruption. The Filax is not intended to supply high power household equipment like washing machines or electric motors.